RESPONSIBILITY FOR NATURE

Since the active use of the stuck pile, the power station site and certain parts of the harbour, decades have passed.  Nature took back the former industrial location in the meantime. On the plateau of the stuck pile, a so-called industrial forest grew.

As part of the feasibility study, not only the existing species are being registered and evaluated but a sensible  replacement will be created in another spot.